Project title | Proposed Sewers in Pasir Ris Dr 3/12 And Jalan Kembangan Areas and Demolition of East Coast Parkway Pump Sump |
---|---|
Client | Public Utilities Board (PUB) |
Project status | Ongoing |
Commencement date | 15th January 2020 |
Depth of shafts | 20m average |
Pipe size | 500mm & 1500 diameter |
Jacking length | 781m |
Category | Sewerage (New sewer and sewer rehabilitation) |
Description | Pasir Ris work is right next to the School, Condo and HDB residential area. Our shaft is located on the center median and encroached into carriage way, to not to disturb the traffic flow metal decking has been installed for all the shafts. Due to this our working hours is constricted to 0930hrs to 1700hrs. |
Jalan Kembangan site is a crowded area which is near to MRT station and landed residential housings. We installed the jacking pipe without disturbing traffic on the nearby as our sewer line is under crossing the MRT viaduct. The proposed pipe level at these areas is very shallow and our shaft & pipe jacking line is within the vicinity of underground services. | |
East Coast Parkway site is near to East Coast Park which is most visited park in Singapore and full of cyclists. Our working hours at ECP site is also constricted to 0930hrs to 1700hrs. |