Proposed Sewers in Jalan Ibadat Area (PUB,WRN)
Proposed Sewers in Pasir Ris Drive 3/12 and Jalan Kembangan Area and Demolition of East Coast Parkway Pump Sump (PUB, WRN)
Proposed Sewers in Lim Chu Kang Area- Contract 6 (PUB, WRN)
Proposed Sewer in Changi East Area (Schedule II) – Contract 2 (PUB,WRN)
Proposed Sewers in Geylang. Jalan Wangi,
Woodlands Ind Park E1 and Collyer Quay Areas
300mm dia, 500mm dia, 600mm dia, 800mm dia
Proposed Sewers In Tuas View Square Area
400mm dia, 500mm dia
Proposed Sewers In Tanah Merah Kechil Area
300mm dia, 500mm dia, 600mm dia, 800mm dia
Proposed Construction Of Infrastructure Works
(Roads, Drains & Sewers) At Lorong Halus
(Phase 1) 1800mm dia Sewer
(Total Length = 850m, Depth Average 16.5m deep)
Construction of Trunk Sewer At Sembawang
Town Neighbourhood 1 (Part 2)
Proposed Sewers In Tampines Road Area
250mm dia
Proposed Sewers In Lorong Chuan and Lim Tua Tow Areas
300mm dia, 800mm dia, 1200mm dia & 1500mm dia
Total Length of 1500mm = 624m of Average Depth of 9m with one line curve jacking
Proposed 2200mm Dia Pipeline From Tanglin Halt Road
To AYE / Hendersson Road
2000mm dia water pipe (800m Length)
(Average depth about 13m Deep, SIII Jurong formation)
Proposed Pipe Laying for Desalination Plant at Marina East
1850mm dia pipe (630m length) of average depth of 10m
Proposed Sewers In Lim Chu Kang Area – Contract 3
1000mm dia pipe (1600m length), 30m to 35m deep
Proposed Sewers In Steven Rd and Merpati Rd Areas
300mm dia, 800mm dia, 900mm dia & 1000mm dia
Construction of Sewers Along Tuas South Avenue 10
400mm, 600mm and 700mm dia (Total 1100m)
Contract CR1087 Sewer and Water diversion works
(Package E)
2200mm (OD) Comosite jacking pipe for internal effluent
discharge pipe (EDP) Mandai Lake Road for the Mandai
Park Development (From MH1 to MH1C)
Proposed Sewers In Pasir Ris Drive 3/12 and Jalan
Kembangan Areas and Demolition of East Coast
Parkway Pump Sump
(500mm dia = 395m, 1500mm dia = 430m, Average Depth about 15m deep)
Proposed Sewers In Changi East Area (Scheduke II) – Contract 2
(1500mm dia = 850m ) Average 20.5m deep
Proposed Sewers In Lim Chu Kang Area – Contract 6
(400mm = 460m, Construction & Demolition of Pump Sump)
Proposed Neste S’pore Expansion Project
Laying of 400mm dia polymer concrete pipe (heavy duty pipe, OD 520mm)
by pipe jacking method across Tuas South Ave 9, West Plot
Proposed 900mm to 1600mm Diameter Industrial
Water Pipelines along Tembusu Avenue and Jurong
Island Highway – Contract 4
Proposed 2200mm Diameter Raw Water Pipeline Along
Kallang River from Bishan Road to Braddel Road
Diversion of Trunk Sewer at Towner Road
(Contract No.D/023/21)
Proposed Sewers in Jalan Ibadat Area
300mm dia (140m)