Project title | Proposed 2200mm Diameter Raw Water Pipeline along Kallang River from Bishan Road to Braddel Road | |
---|---|---|
Client | Ah Boon Civil Engineering & Building Contractor | |
Project status | Ongoing | |
Commencement date | 31st March 2022 | |
Depth of shafts | 20m average | |
Pipe size | 2200mm diameter | |
Jacking length | 3km | |
Category | Raw water | |
Description | Bishan Project is a 2.2m Diameter Sewer pipe 3Km long project. It is positioned next to HDB township in a heavily crowded urban region. Our Sewer line must go over MRT line and Under CTE bridge. Right next to the Bishan River is where our Jacking line and shaft are located. Therefore, Bishan River must be protected from contamination. |